MMVA 2012 – Phase 1 from Sam Javanrouh on Vimeo.

Schaefer provided the engineering design for the temporary roof systems, constructed with Premier Global Productions’ truss and tower components. The roof systems have three separate trusses between the roofs and are supported off of the roof towers. The main stage measured 180 feet wide and took two weeks to build. Make sure you watch the time lapse video of this impressive series of stages constructed within a very tight area of parking lots and adjacent streets.